On a site constrained by roads and involving a series of challenging grade changes a presentation was needed by the developer to demonstrate that the proposed building and parking would work with the site’s topography while providing adequate sight-line buffers for the building from the vehicle headlights.
ÆGS prepared a rendered site plan from the engineer’s drawings, then drafted sections from the provided contours and building information. The sections were then simply rendered and labels added, allowing the presentation to read at a distance.